Stage Build - Day 1
Enshrinement
Published on : 8/5/2015
Previous Article
Time Lapse: Stage Build Day 3
Raise the roof!
Next Article
Time Lapse: Covering the Playing Surface
Sun. Aug. 2 - 83,000 sq. ft. of the playing surface at Tom Benson Hall of Fame Stadium was covered with 6,775 floor tiles in preparation for the Enshrinement.